Southsoftware.com
.:Pricing
Home
Products
Downloads
Support
Contacts
Site Map
.:Advanced Task Scheduler
About product
Download trial
Purchase license
Compare editions
View screenshot
FAQ & Support
Press Kit
.:Articles
Online manual
Blog posts
Videos
More articles...
.:Follow us
Follow us on Facebook Follow us on Twitter Follow us on YouTube
   

Holiday properties

In Advanced Task Scheduler Professional and Network Editions it is possible to run a task on work days, non-work days or holidays.

Generally, there are two ways no define a holiday in Advanced Task Scheduler: specify fixed dates or allow Advanced Task Scheduler to calculate date of a holiday using common techniques such as first/second/etc. weekday on or preceding/after the day of the month, weekday nearest to the day of the month, Western/Orthodox/Julian Easter, and so on.

A holiday can belong to one of three predefined categories: Public Holiday, Non-holiday Observance or User Event. The categories can be used to run different tasks with different holiday sets.

Public holidays are respected when you select work days or non-work days options in other schedule types.

Related Articles
Holiday Aware Task Scheduler

Categories: Manual, Reference

   
About us   Privacy policy   Terms of use   Link to us
Current Version: 4.5.0.616
The following prices are based on a single order:
Basic Edition 32 and 64-bit$ 39.95 USD
Professional Edition 32 and 64-bit$ 59.95 USD
Network Edition 32 and 64-bit$ 149.95 USD
.:Testimonials

I use Advanced Task Scheduler to run my backups jobs. After performing a backup by standard Windows 2003 Server means, Advanced Task Scheduler launches a script which copies files. I am glad I chose your program.

Rob Hannigan

.:Requirements
Computer: Minimum required by operating system you are running.
Disk Space: Under 30 MB
Operating System: Microsoft Windows 32-bit or 64-bit.
Read more...